FMG 0.45% $22.10 fortescue ltd

Iron ore average for the 1/4 US$71.53 FX for the 1/4 AU$0.7171...

  1. 31,568 Posts.
    lightbulb Created with Sketch. 1494
    Iron ore average for the 1/4 US$71.53

    FX for the 1/4 AU$0.7171

    Iron ore in AU for the Qtr $99.75/t
 
watchlist Created with Sketch. Add FMG (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.