ROY told me today they want to issue some available drill results on Wednesday before the AGM. All they told me was the width between drill holes across the strike was 250 metres and the length was 1 km.
PV1 Provaris tells ASX non-binding MOUs are still material to share prices in somewhat fiery compliance response