I'd say unlikely, and here is why. In terms of down hole completion architecture they would have to install a permanent, or semi permanent monitoring systems. A permanent system is a cable based pressure monitoring system, while semi permanent system could be a set of memory gauges set down hole. One supplies real time data while the other supplies data that is downloaded once the system is retrieved. The semi permanent memory based system doesn't need any surface data acquisition infrastructure, the cable based system does. Obviously none of this currently exists as while the well will be suspended, there is clearly no wellhead subsea infrastructure, just a suspended wellbore. So lets assume they have memory gauges installed in the wellbore. That would mean the rig has to go back, enter the well and retrieve the system to get the data. Based on my assumptions above I just don't see that they have this information.
- Forums
- ASX - By Stock
- FAR
- Is a Left Field Event Possible
Is a Left Field Event Possible, page-20
-
- There are more pages in this discussion • 80 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
49.5¢ |
Change
-0.003(0.50%) |
Mkt cap ! $45.74M |
Open | High | Low | Value | Volume |
50.0¢ | 50.3¢ | 49.5¢ | $74.71K | 149.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 37432 | 49.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
51.0¢ | 202895 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 191996 | 0.490 |
2 | 104597 | 0.485 |
2 | 110000 | 0.480 |
1 | 100000 | 0.475 |
1 | 100000 | 0.470 |
Price($) | Vol. | No. |
---|---|---|
0.510 | 202895 | 4 |
0.515 | 103300 | 2 |
0.520 | 421965 | 4 |
0.525 | 100000 | 1 |
0.530 | 20000 | 1 |
Last trade - 16.10pm 06/09/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |