1. Only 6 holes drilled of the 15 hole drilling campaign since it started on the 28th March. 9 holes to go, so we should be some more drilling action soon.
2. Its been 12 days (8th Aug) since the announcement that Cerulean #2 showed gas. It shouldn't be long before we find out the flow rates.
Question: If Cerulean #2 has commercial gas flows. How long will it take to build a pipeline approx 10Klm long to the existing pipeline? Or can it be transported by truck.