The gist is, CFU takes the generator to the load - doing away with the largescale design of national distributed networks based on central generation.
The CFU cost model comparison to the demand for solar holds the key for CFU IMO. It needs to get the bluegen units down to below $10K per unit per 10 year lifecycle.
I am sure some utilities will embrace this, while others will be afraid of it.
Add to My Watchlist
What is My Watchlist?