M4M 2.70% 3.8¢ macro metals limited

Is everyone ready for the pump n dump?, page-140

  1. aTx
    252 Posts.
    lightbulb Created with Sketch. 68
    RE: EBITDA…Final scoping study needs to demonstrate / confirm this project has enough ore to mine for a ~20 year span. (Which I think, if I remember correctly, during Turvey’s tenure, had a study done that calculated that length of time + amount of ore in ground.)

    RE: half capex…Would be determined by cost-saving design of facility buildout, method(s) of mining operation(s) & refinement, method of transportation of ore; ore can be transported and paid for by third parties and/or ore buyers. And design of energy generation and output (towards reusable means). Board could also negotiate beneficial tax incentives with Kogi State government.

    Board could also work out a deal with a big time company (Vale for ex.) for a ‘first-in-line’ opportunity to buyout Kogi…for a startup funding package to help Kogi with start up operations.

    …all depends on final scoping study, and salesmanship.
    Last edited by aTx: 15/01/22
 
watchlist Created with Sketch. Add M4M (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
0.001(2.70%)
Mkt cap ! $136.7M
Open High Low Value Volume
3.9¢ 4.0¢ 3.7¢ $246.2K 6.345M

Buyers (Bids)

No. Vol. Price($)
8 849594 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.9¢ 977277 5
View Market Depth
Last trade - 15.59pm 03/07/2024 (20 minute delay) ?
M4M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.