RE: EBITDA…Final scoping study needs to demonstrate / confirm this project has enough ore to mine for a ~20 year span. (Which I think, if I remember correctly, during Turvey’s tenure, had a study done that calculated that length of time + amount of ore in ground.)
RE: half capex…Would be determined by cost-saving design of facility buildout, method(s) of mining operation(s) & refinement, method of transportation of ore; ore can be transported and paid for by third parties and/or ore buyers. And design of energy generation and output (towards reusable means). Board could also negotiate beneficial tax incentives with Kogi State government.
Board could also work out a deal with a big time company (Vale for ex.) for a ‘first-in-line’ opportunity to buyout Kogi…for a startup funding package to help Kogi with start up operations.
…all depends on final scoping study, and salesmanship.
- Forums
- ASX - By Stock
- M4M
- Is everyone ready for the pump n dump?
Is everyone ready for the pump n dump?, page-140
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add M4M (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.001(12.5%) |
Mkt cap ! $32.60M |
Open | High | Low | Value | Volume |
0.9¢ | 1.0¢ | 0.9¢ | $154.3K | 16.52M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
21 | 9966775 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 2559753 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
21 | 9966775 | 0.008 |
18 | 5917178 | 0.007 |
12 | 10240000 | 0.006 |
17 | 11188008 | 0.005 |
6 | 5372511 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 2559753 | 1 |
0.010 | 1265444 | 3 |
0.011 | 3207111 | 9 |
0.012 | 3037245 | 7 |
0.013 | 788017 | 5 |
Last trade - 16.10pm 04/11/2024 (20 minute delay) ? |
Featured News
M4M (ASX) Chart |