M4M 5.00% 1.9¢ macro metals limited

RE: EBITDA…Final scoping study needs to demonstrate / confirm...

  1. aTx
    252 Posts.
    lightbulb Created with Sketch. 68
    RE: EBITDA…Final scoping study needs to demonstrate / confirm this project has enough ore to mine for a ~20 year span. (Which I think, if I remember correctly, during Turvey’s tenure, had a study done that calculated that length of time + amount of ore in ground.)

    RE: half capex…Would be determined by cost-saving design of facility buildout, method(s) of mining operation(s) & refinement, method of transportation of ore; ore can be transported and paid for by third parties and/or ore buyers. And design of energy generation and output (towards reusable means). Board could also negotiate beneficial tax incentives with Kogi State government.

    Board could also work out a deal with a big time company (Vale for ex.) for a ‘first-in-line’ opportunity to buyout Kogi…for a startup funding package to help Kogi with start up operations.

    …all depends on final scoping study, and salesmanship.
    Last edited by aTx: 15/01/22
 
watchlist Created with Sketch. Add M4M (ASX) to my watchlist
(20min delay)
Last
1.9¢
Change
-0.001(5.00%)
Mkt cap ! $61.40M
Open High Low Value Volume
2.0¢ 2.1¢ 1.9¢ $492.6K 24.39M

Buyers (Bids)

No. Vol. Price($)
6 985945 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
2.0¢ 750000 2
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
2.0¢
  Change
-0.001 ( 2.50 %)
Open High Low Volume
2.0¢ 2.1¢ 1.9¢ 21985022
Last updated 15.45pm 03/05/2024 ?
M4M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.