The existing rail line would not/can not be needed/used for any thing other than sugar cane transport...The two alternatives are either Contractor owned/operated dump trucks, or, as in the Gove operation, an overland conveyor..
The Gove conveyor extends/extended, from Pit to shipping terminal for a distance of approx. 26kms.
One other advantage for a conveyor is that it is easily and simply installed and can be re-positioned with a minimum of terrain disturbance... Maintenance requirements are simple and a lot less expensive than for a fleet of Dump Trucks..
- Forums
- ASX - By Stock
- Is RagingBoom accumulating AGAIN?
The existing rail line would not/can not be needed/used for any...
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)