JPR 0.00% 2.5¢ jupiter energy limited

is the tide about to turn?, page-19

  1. 810 Posts.
    when are we all anticipating drilling to resume?

    i am assuming sometime tomorrow :

    At 1200 hrs on 22 March 2009, the well had reached a depth of 2957mRT and the crew
    were pulling out of hole to pick up and run a core barrel. The Middle Triassic reservoir will
    be cored and comprehensively evaluated to improve the Companys understanding of the
    formation. The future activity plan is as follows:
    h Cut 2 x 9m cores (3 days)
    h Drill 45m of reservoir (3 days)
    h Cut 3 x 9m cores (4-5 days)
    h Drill to total depth
    h Run extensive electric wireline logging suites across the zones of interest.
 
watchlist Created with Sketch. Add JPR (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
0.000(0.00%)
Mkt cap ! $31.86M
Open High Low Value Volume
2.5¢ 2.5¢ 2.5¢ $75 3K

Buyers (Bids)

No. Vol. Price($)
2 117947 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 161037 1
View Market Depth
Last trade - 14.45pm 05/09/2024 (20 minute delay) ?
JPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.