Phil K
How would Bob expect to mine 400 - 500 tpa (1 mlbs pa) when the resource is only 2,100 tonnes?
Would this not lead to higher CAPEX to meet the higher annual production but be less economic due to a short mine life?
For example, mining 200 tpa would result in lower CAPEX.
Did you have an idea on the type of capital required and the cost of that capital?
Is there exploration upside to reach 5,000 tonnes?
Thanks
- Forums
- ASX - By Stock
- is there an issue
Phil KHow would Bob expect to mine 400 - 500 tpa (1 mlbs pa)...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CUY (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online