I've only read your post and with not much background on MAK but with a backgound in mining I would say:
(Diamond) drill core is cut up for assaying during exploration and resource estimation stages. This leads to JORC compliant resource estimate if the orebody hangs together i.e. targeting grade and geology. Not enough core is left for metallurgical testing.
Further drilling is required for feasability studies purely for metallurgical test work. This identifies how the ore will go through the mill and the ore characteristics are examined i.e. lump vs fines % etc.
If the deposit was drilled out with RC drilling technique then it is prudent to follow up with diamond holes for met testing also.
- Forums
- ASX - By Stock
- is there any future?
I've only read your post and with not much background on MAK but...
-
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.74M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.5¢ | $4.891K | 978.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 7284260 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 8324063 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 7284260 | 0.005 |
13 | 7984631 | 0.004 |
11 | 6273337 | 0.003 |
8 | 5435000 | 0.002 |
4 | 7399950 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 7524063 | 11 |
0.007 | 6187807 | 9 |
0.008 | 7188125 | 9 |
0.009 | 386000 | 2 |
0.010 | 1321252 | 4 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
AEV (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online