In my view they should get away with 4 core runs of 54m each and a little bit less on the 4th run for the full 200m planned core (instead of 208m).
Once that's done, ream the hole flush out the debris and then log the cored interval with the MWD/LWD tool. This is crucial as the core will b cut over the Caley reservoir as well as the Baxter, so initial pass from the MWD/LWD data holds the key to picking the formation change depth.
Not much happens with the core on the rig as they prep it up into desired lengths for transport to the Lab where detailed analysis r done for porosity & perm and any SCAL/RCA as requested. Ont he rig though they'll do the usual visual checks on the samples that will b provided by the core hands & also check for Oil fluorescence etc. Basically routine drilling Operations.
- Forums
- ASX - By Stock
- CVN
- Is this 5 letter word really that scary?
Is this 5 letter word really that scary?, page-25
-
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $259.4M |
Open | High | Low | Value | Volume |
15.0¢ | 15.0¢ | 14.5¢ | $151.0K | 1.023M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 1313406 | 14.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
15.0¢ | 1004797 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 1313406 | 0.145 |
14 | 2376794 | 0.140 |
3 | 462000 | 0.135 |
6 | 534621 | 0.130 |
1 | 257502 | 0.125 |
Price($) | Vol. | No. |
---|---|---|
0.150 | 948437 | 11 |
0.155 | 1061157 | 15 |
0.160 | 889989 | 17 |
0.165 | 225510 | 6 |
0.170 | 477678 | 10 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |