CVN 9.68% 17.0¢ carnarvon energy limited

In my view they should get away with 4 core runs of 54m each and...

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    In my view they should get away with 4 core runs of 54m each and a little bit less on the 4th run for the full 200m planned core (instead of 208m).
    Once that's done, ream the hole flush out the debris and then log the cored interval with the MWD/LWD tool. This is crucial as the core will b cut over the Caley reservoir as well as the Baxter, so initial pass from the MWD/LWD data holds the key to picking the formation change depth.

    Not much happens with the core on the rig as they prep it up into desired lengths for transport to the Lab where detailed analysis r done for porosity & perm and any SCAL/RCA as requested. Ont he rig though they'll do the usual visual checks on the samples that will b provided by the core hands & also check for Oil fluorescence etc. Basically routine drilling Operations.
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
17.0¢
Change
0.015(9.68%)
Mkt cap ! $304.1M
Open High Low Value Volume
15.0¢ 17.0¢ 15.0¢ $675.5K 4.272M

Buyers (Bids)

No. Vol. Price($)
2 59750 16.0¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 1916292 14
View Market Depth
Last trade - 16.10pm 14/08/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.