EPM eclipse metals limited.

Is this resource under water?, page-207

  1. 166 Posts.
    lightbulb Created with Sketch. 351
    Well thanks for that, Look forward to seeing what you have that the website and we don't have. I'm pretty sure information will be with Greenland mining archives or on the website since EPM is the owner of the mine. So if you want to hear from then just have to wait a bit when we hear about the JORC report. That'll tell everything

    From a rough calculation assuming the dept of the pit is 60 meters and the radius is 100 meters I calculated that there is ~ 1,884,955.5 meters cubed of water give or take a few thousand. now if you were to use one, i'd assume any degree holder would first drain said basin before pumping water from the pit to said basin to hold. Would be odd to just start pumping water whilst it's already filled. Another could be to drain one of the other basins, and potentially mine it, making it quite a bit deeper, then once mined could start on the pit, and drain that to the basin. Just spit balling thought you lead me to believe your plan would be to never have drained it from the first place.

    look forward to seeing what your research is, best to provide it sooner rather than later, espeically we are talking about one of the many projects EPM has under it's belt

 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.4¢
Change
-0.001(6.67%)
Mkt cap ! $41.98M
Open High Low Value Volume
1.5¢ 1.5¢ 1.4¢ $37.98K 2.585M

Buyers (Bids)

No. Vol. Price($)
14 2781171 1.4¢
 

Sellers (Offers)

Price($) Vol. No.
1.5¢ 3533738 4
View Market Depth
Last trade - 16.10pm 27/06/2025 (20 minute delay) ?
EPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.