EPM 0.00% 0.8¢ eclipse metals limited.

Is this resource under water?, page-250

  1. 8,479 Posts.
    lightbulb Created with Sketch. 792
    No rantings about cracks in the pit. Why? Because it was full of water. The students examined the debris of mining waste - on the surface.
 
watchlist Created with Sketch. Add EPM (ASX) to my watchlist
(20min delay)
Last
0.8¢
Change
0.000(0.00%)
Mkt cap ! $18.00M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 1750000 0.8¢
 

Sellers (Offers)

Price($) Vol. No.
0.9¢ 1225405 4
View Market Depth
Last trade - 10.08am 28/06/2024 (20 minute delay) ?
EPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.