Is this the linear generator we have been looking for?
“The work completed by 42 Technology, optimisation of PowerPod II, has led to an improved design of the existing power take-off technology such that it is applicable to a wider range of WECs currently being developed,” said Steve Packard, CEO at Trident Energy. “The higher power output, reduced package size and improved availability – due to reduced maintenance cycles – has encouraged the assessment of the technical detail and detailed review of how PowerPod II could be integrated within different WEC applications and device concepts.”
The detailed design phase for PowerPod II has begun and is scheduled to be complete within six weeks.
https://www.theengineer.co.uk/redes...et-to-make-waves-with-wave-energy-converters/
Add to My Watchlist
What is My Watchlist?