ZMM 0.00% 1.2¢ zimi limited

is whn drilling wa-460-p this year?, page-3

  1. 1,496 Posts.
    FYI

    From STX ann:
    The joint venture is required to reprocess 92 km of 2D seismic and to acquire 9.5km of 2D seismic and 81km2 of 3D seismic within the first three permit years

    Could be upto 3 years away from an exploration well depending on the 3D seismic.

    Just have to look at WA-360P of MEO.

    Permit issued 2007, 3D data completed 2009, Farmout to Petrolbas and one exploration well drilled in 2010. Plugged and abandoned Nov 2010.

    DYOR
 
watchlist Created with Sketch. Add ZMM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.