Hi Charlie, Shane.
Going back over my "back of envelope" figure which seems bloody years ago now, the tonnage rates across all 3 grades for a possible 100% explored lease (all of the original Isabel lease) would be around 180mt. In those calcs there is a LOM for medium to high grade Ni ore @ around 45 years not including refining the lower grades at a production rate of 2mtpa.
I would expect San Jorge to be much larger due to the larger area of mineralisation than the boutique stile Isabel lease. Fingers crossed we get some good grades in this round of the drilling programe.
Jalaluddin.
Not sure where your posts are coming from.
1/ In regards to your "closely drilled holes" you seem to think targets in the JORC compliance infill drilling were too close......... Would you prefer 200 by 200 spacings.?????
2/."independent teams"..... generally the go with multiple drill teams.?????...all nationals and supervised by accredited engineers.
3/ "independent assays"........ again generally the go with multiple drilling programs.????
AVQ Price at posting:
22.0¢ Sentiment: Buy Disclosure: Held