It dosnt Add up., page-10

  1. 48,484 Posts.
    Bridges?
    Intersections?
    Traffic lights?
    Lighting?
    Drainage?

    Earthworks. Environmental management. Traffic management. Landscape and rehabilitation. Land resumption. Noise walls. Pedestrian underpasses. Approach ramps. Realignment of existing roads and services. Temporary roads. Night works. Etc etc

    Comparing the major highway construction to a poxy driveway or car park is not even close.

    There is a lot of planning, design and construction that happens to enable that last layer of asphalt or concrete that you drive on to be built.

    The contracts will be competitively tendered in an open public tender process so I wouldn't be too concerned about the cost of the project.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.