Yep awaiting assays for traverse 3 a km north of traverse 1. Drilling must be just about done for traverse 4 now.
From the July 10th announcement
"Next StepsTraverse 3 has been completed at a northing of 6,317,700mN, which is over 2km north of traverse 2 and 1km north of traverse 1. Samples have been submitted and results are pending. The drill rig has now moved to traverse 4, at a northing of 6,314,400mN which is 1.3 km south of traverse 2.Together these four traverses cover over 3.6 km of strike length of graphite mineralisation."
- Forums
- ASX - By Stock
- ITM Megathread
Yep awaiting assays for traverse 3 a km north of traverse 1....
-
- There are more pages in this discussion • 286 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ITM (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.2¢ |
Change
-0.002(2.70%) |
Mkt cap ! $8.804M |
Open | High | Low | Value | Volume |
7.3¢ | 7.3¢ | 7.2¢ | $13.67K | 188.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 202524 | 7.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.4¢ | 1393 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 202524 | 0.072 |
2 | 12412 | 0.071 |
4 | 234006 | 0.070 |
1 | 50000 | 0.069 |
2 | 62059 | 0.068 |
Price($) | Vol. | No. |
---|---|---|
0.074 | 1393 | 1 |
0.077 | 56814 | 3 |
0.079 | 100000 | 1 |
0.080 | 105128 | 3 |
0.081 | 106269 | 2 |
Last trade - 15.12pm 31/05/2024 (20 minute delay) ? |
|
|||||
Last
7.2¢ |
  |
Change
-0.002 ( 4.00 %) |
|||
Open | High | Low | Volume | ||
7.2¢ | 7.2¢ | 7.2¢ | 18379 | ||
Last updated 15.12pm 31/05/2024 ? |
Featured News
ITM (ASX) Chart |