I am confused regarding the "guide us in determining the required infrastructure" I am new to O & G can anyone tell me if this might refer to unique infrastructure requirements of a possible highly pressurised well as opposed to normat pressures or is the fact other wells have produced a lot more than 1800mcf/d on 6/64 choke already telling us this is normal pressure. Does the pressure sometimes go higher as the well choke increases and produces for longer. Appreciate replies
VIL Price at posting:
4.5¢ Sentiment: Buy Disclosure: Not Held