Not well versed in O&G myself. Once we have long lead items on site, any idea how long it will take for setup & drilling of first well? I see mentioned in the latest investor presentation 10km+ to basement, and structured modelled in the seismic results 6km+ - anyone know how deep we might actually be drilling on first hole (of course current seismic will clarify this).
Googling gives a whole sequence of augering and setting conductor casing, rig up etc etc - really I'm wondering from people with experience how long this all takes. I'm guessing 2-4 months - is this realistic?
I'm sure drilling multi km holes is technically challenging, but is this common pactice and low risk, or potential to be problematic?
As mentioned in other threads, would be great to get an updated timeline with these details - I'm sure the team will deliver soon.
Cheers
- Forums
- ASX - By Stock
- IVZ Project Update / Clarification
Gents, Not well versed in O&G myself. Once we have long lead...
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
7.2¢ |
Change
-0.003(4.00%) |
Mkt cap ! $102.0M |
Open | High | Low | Value | Volume |
7.5¢ | 7.5¢ | 7.0¢ | $173.6K | 2.425M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 9513 | 7.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.4¢ | 90000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 281690 | 0.071 |
3 | 300858 | 0.070 |
5 | 145361 | 0.069 |
1 | 90000 | 0.068 |
3 | 184126 | 0.067 |
Price($) | Vol. | No. |
---|---|---|
0.074 | 90000 | 1 |
0.075 | 150000 | 1 |
0.076 | 169627 | 3 |
0.077 | 278285 | 2 |
0.078 | 10000 | 1 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |