Also, Scott did say in webinar, that'll take 4-6 weeks duration to set up the wellpad and rig in a new location, which is much shorter than Mukuyu 1, and that it'll get shorter thereafter as wrell for subsequent wells. Also said that the next well will be straight down. Also Boabab is shallower and cheaper and the 3rd option, Mopane, shallower and cheaper still
Has to be cheaper and less troublesome without steering, dog legs and sidetracks
- Forums
- ASX - By Stock
- IVZ
- IVZ Share Price
IVZ Share Price, page-11939
-
- There are more pages in this discussion • 10,229 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
7.8¢ |
Change
-0.003(3.70%) |
Mkt cap ! $110.5M |
Open | High | Low | Value | Volume |
8.0¢ | 8.1¢ | 7.7¢ | $151.9K | 1.932M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 237927 | 7.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.9¢ | 255554 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 237927 | 0.078 |
3 | 54727 | 0.077 |
4 | 255657 | 0.076 |
4 | 153333 | 0.075 |
4 | 427202 | 0.074 |
Price($) | Vol. | No. |
---|---|---|
0.079 | 255554 | 4 |
0.080 | 50000 | 1 |
0.081 | 343873 | 1 |
0.082 | 200000 | 1 |
0.083 | 80000 | 1 |
Last trade - 16.10pm 23/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online