"Having never worked on a land drilling week, i don't know how much time is required to fully rig up after mobilisation is complete."
Generally rig up and mobilization are happening at the same time. Rig components arrive and are assembled as other components are leaving the old site. With a short rig move, plenty of trucks and a gun crew a rig of this type can be moved and ready to drill in 3-4 days.
Note that once they've got the rig assembled it has to be accepted by the operator and the new mud tank system has to be commissioned and tested before that happens.
- Forums
- ASX - By Stock
- IVZ
- IVZ Share Price
IVZ Share Price, page-14091
-
-
- There are more pages in this discussion • 8,770 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $107.6M |
Open | High | Low | Value | Volume |
7.2¢ | 7.2¢ | 7.1¢ | $36.08K | 505.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 79487 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.2¢ | 514222 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 79487 | 0.071 |
4 | 167045 | 0.070 |
3 | 236992 | 0.069 |
4 | 149100 | 0.068 |
6 | 277731 | 0.067 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 514222 | 5 |
0.073 | 558900 | 5 |
0.074 | 354688 | 5 |
0.075 | 203333 | 2 |
0.078 | 115267 | 1 |
Last trade - 12.22pm 27/09/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |