"It looks like they didn't do a wiper trip on mk1 before wireline. Would this have exaberated the hole deterioration problems we were having?"
No mid wireline operation wiper trip programmed for M1 because wireline operations were expected to be much shorter in duration than in M2. Looking at the hole issues and differential sticking issues we had in M1 I think a wiper trip would have been pointless unless they dropped the mud weight at the same time.
"how common is it to do a wiper trip before logging and why do you think they have chosen to this time around?"
This is a mid wireline job wiper trip and it's quite a common practice where there's a prolonged logging program planned and it includes MDTs.
- Forums
- ASX - By Stock
- IVZ
- IVZ Share Price
IVZ Share Price, page-16223
-
-
- There are more pages in this discussion • 5,475 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.9¢ |
Change
0.003(4.55%) |
Mkt cap ! $97.83M |
Open | High | Low | Value | Volume |
6.8¢ | 6.9¢ | 6.6¢ | $269.3K | 3.995M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 482259 | 6.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 421552 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 482259 | 0.066 |
4 | 648779 | 0.065 |
3 | 216877 | 0.064 |
3 | 172538 | 0.063 |
3 | 265000 | 0.062 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 421552 | 2 |
0.070 | 482500 | 3 |
0.071 | 1035913 | 5 |
0.072 | 1040000 | 4 |
0.073 | 960000 | 2 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online