"In Australia the sidetrack would get its final TD which is what it is now. The extension would be a new activity, be named ST1 Ext or similar and get a proposed TD and actual TD when it is drilled"
Technically the 6" hole is the production hole section of Mukuyu-1 ST1. It's an extension of the sidetrack but I've never seen extensions of a well given annotations to the well name to signify same.
Muultiple rigs being used on a well can present some challenges in terms of data sets. The only critical piece of data that would change is the RT-GL height. Whenever I've been on jobs with this scenario the data sets were all depth shifted to a single RT-GL height (usually the highest figure).
- Forums
- ASX - By Stock
- IVZ Share Price
"In Australia the sidetrack would get its final TD which is what...
-
-
- There are more pages in this discussion • 4,002 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
7.7¢ |
Change
0.002(2.67%) |
Mkt cap ! $110.9M |
Open | High | Low | Value | Volume |
7.7¢ | 7.9¢ | 7.6¢ | $133.5K | 1.730M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 274157 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 328 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 160566 | 0.075 |
1 | 50000 | 0.074 |
1 | 26000 | 0.073 |
3 | 105482 | 0.072 |
5 | 95890 | 0.071 |
Price($) | Vol. | No. |
---|---|---|
0.077 | 328 | 1 |
0.080 | 55118 | 2 |
0.081 | 305220 | 2 |
0.082 | 505000 | 3 |
0.083 | 588000 | 3 |
Last trade - 16.10pm 09/08/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |