"In Australia the sidetrack would get its final TD which is what it is now. The extension would be a new activity, be named ST1 Ext or similar and get a proposed TD and actual TD when it is drilled"
Technically the 6" hole is the production hole section of Mukuyu-1 ST1. It's an extension of the sidetrack but I've never seen extensions of a well given annotations to the well name to signify same.
Muultiple rigs being used on a well can present some challenges in terms of data sets. The only critical piece of data that would change is the RT-GL height. Whenever I've been on jobs with this scenario the data sets were all depth shifted to a single RT-GL height (usually the highest figure).
- Forums
- ASX - By Stock
- IVZ Share Price
"In Australia the sidetrack would get its final TD which is what...
-
-
- There are more pages in this discussion • 4,355 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
0.001(1.45%) |
Mkt cap ! $106.1M |
Open | High | Low | Value | Volume |
6.8¢ | 7.0¢ | 6.7¢ | $120.7K | 1.742M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 6.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.0¢ | 341028 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 0.069 |
3 | 362283 | 0.068 |
3 | 162045 | 0.067 |
3 | 162766 | 0.066 |
5 | 573935 | 0.065 |
Price($) | Vol. | No. |
---|---|---|
0.070 | 341028 | 4 |
0.071 | 1064037 | 10 |
0.072 | 897000 | 7 |
0.073 | 1015999 | 5 |
0.074 | 42618 | 1 |
Last trade - 16.10pm 13/09/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online