IVZ 1.49% 6.8¢ invictus energy ltd

"In Australia the sidetrack would get its final TD which is what...

  1. 3,706 Posts.
    lightbulb Created with Sketch. 2852
    "In Australia the sidetrack would get its final TD which is what it is now. The extension would be a new activity, be named ST1 Ext or similar and get a proposed TD and actual TD when it is drilled"

    Technically the 6" hole is the production hole section of Mukuyu-1 ST1. It's an extension of the sidetrack but I've never seen extensions of a well given annotations to the well name to signify same.

    Muultiple rigs being used on a well can present some challenges in terms of data sets. The only critical piece of data that would change is the RT-GL height. Whenever I've been on jobs with this scenario the data sets were all depth shifted to a single RT-GL height (usually the highest figure).
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.