Question...given they have the rig war stacked if they give the go ahead for next well then how long does it take to prepare the well head and get the brig checked an in place ready for the drill?
That should tell us a thing or two re timing for next drill. They will most likely have to cease drilling by November sometime so if they say go in August another 6 weeks to get rig ready (incl. long lead items) then 8 weeks drilling time before they have to say stop? Wet season?
- Forums
- ASX - By Stock
- IVZ Share Price
Question...given they have the rig war stacked if they give the...
-
- There are more pages in this discussion • 2,902 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.2¢ |
Change
0.002(2.86%) |
Mkt cap ! $97.83M |
Open | High | Low | Value | Volume |
6.9¢ | 7.2¢ | 6.9¢ | $77.03K | 1.086M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 147005 | 7.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.1¢ | 27322 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 120000 | 0.070 |
1 | 123927 | 0.069 |
5 | 213088 | 0.068 |
5 | 225291 | 0.067 |
4 | 165873 | 0.066 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 30005 | 2 |
0.073 | 22369 | 2 |
0.074 | 113388 | 1 |
0.075 | 153733 | 3 |
0.076 | 141560 | 2 |
Last trade - 11.44am 09/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |