Totally agree, however when talking to Scott, he advised that 3D can be started literally with the push of a button.
For the flow test to commence, it will require all equipment to be in place, crews ready and rig to be re-built. That is not going to happen overnight.
I feel the 3D could be completed whilst the drill preparation is happening. I also agree it will not be a catalyst for a higher sp alone, but completed in conjunction with the flow test set up/six inch drill expectations for the juicy Lower Angwa and hopefully some updated results from recent 2D - advising future targets/plans for the basin and we will be heading north.
In a perfect world haha!
- Forums
- ASX - By Stock
- IVZ Share Price
Totally agree, however when talking to Scott, he advised that 3D...
-
-
- There are more pages in this discussion • 2,833 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.6¢ |
Change
-0.001(1.49%) |
Mkt cap ! $100.0M |
Open | High | Low | Value | Volume |
6.6¢ | 6.6¢ | 6.5¢ | $6.081K | 92.39K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3382 | 6.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.7¢ | 138139 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 272005 | 0.065 |
2 | 194792 | 0.064 |
5 | 425111 | 0.063 |
3 | 479487 | 0.062 |
4 | 800099 | 0.061 |
Price($) | Vol. | No. |
---|---|---|
0.067 | 138139 | 4 |
0.068 | 92728 | 2 |
0.069 | 161700 | 2 |
0.071 | 150000 | 1 |
0.073 | 15000 | 1 |
Last trade - 15.54pm 06/11/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |