Totally agree, however when talking to Scott, he advised that 3D can be started literally with the push of a button.
For the flow test to commence, it will require all equipment to be in place, crews ready and rig to be re-built. That is not going to happen overnight.
I feel the 3D could be completed whilst the drill preparation is happening. I also agree it will not be a catalyst for a higher sp alone, but completed in conjunction with the flow test set up/six inch drill expectations for the juicy Lower Angwa and hopefully some updated results from recent 2D - advising future targets/plans for the basin and we will be heading north.
In a perfect world haha!
- Forums
- ASX - By Stock
- IVZ Share Price
Totally agree, however when talking to Scott, he advised that 3D...
-
-
- There are more pages in this discussion • 1,178 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.1¢ |
Change
-0.001(1.61%) |
Mkt cap ! $85.07M |
Open | High | Low | Value | Volume |
6.2¢ | 6.2¢ | 6.0¢ | $310.8K | 5.127M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 630605 | 6.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.1¢ | 278923 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
8 | 626605 | 0.060 |
5 | 900974 | 0.059 |
6 | 380663 | 0.058 |
3 | 125500 | 0.057 |
3 | 420714 | 0.056 |
Price($) | Vol. | No. |
---|---|---|
0.061 | 278923 | 3 |
0.062 | 169678 | 3 |
0.063 | 354821 | 5 |
0.064 | 862727 | 4 |
0.065 | 772129 | 6 |
Last trade - 14.20pm 26/06/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |