IVZ 1.49% 6.8¢ invictus energy ltd

Thanks for clarifying. Well then I agree, we would definitely be...

  1. 142 Posts.
    lightbulb Created with Sketch. 32
    Thanks for clarifying. Well then I agree, we would definitely be doing the flow test first. If the planning and prep with the preferred contractor is done for the 3D then surely that will start in the next 2-3 months, which means flow test before in June probably. I wonder what the real shortfall in cash is for getting the flow test and 3D done if there is one.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.