Grfe,
NG and LNG in Zimbabwe is stranded i.e. isolated from market prices because there are no import facilities or infrastructure.
In that case, we can look to RLT in south africa. Although south africa has the sasol NG pipeline infrastructure, as yet they have no LNG facilities or infrastructure.
So the Phase 1 LNG produced by RLT has been trucked to industrial and transport users as a diesel replacement, and is priced accordingly.
Consequently we can use the diesel price in Zimbabwe as a starting point for LNG sales.
- Forums
- ASX - By Stock
- IVZ Share Price
Grfe,NG and LNG in Zimbabwe is stranded i.e. isolated from...
-
- There are more pages in this discussion • 671 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.5¢ |
Change
-0.002(2.60%) |
Mkt cap ! $108.0M |
Open | High | Low | Value | Volume |
7.7¢ | 7.7¢ | 7.5¢ | $46.86K | 615.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.6¢ | 229715 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 0.075 |
2 | 140000 | 0.074 |
1 | 26000 | 0.073 |
3 | 142180 | 0.072 |
6 | 375890 | 0.071 |
Price($) | Vol. | No. |
---|---|---|
0.076 | 229715 | 1 |
0.077 | 404631 | 3 |
0.078 | 100000 | 1 |
0.080 | 35118 | 1 |
0.081 | 305220 | 2 |
Last trade - 15.56pm 08/08/2024 (20 minute delay) ? |
Featured News
NEWS
Is oil undervalued?
IVZ (ASX) Chart |