"More like will SLB take less risk parameters in putting their wireline tool down the hole if they believe Baker didnt' do a good hole job vs if they had the contract for everything they would take on more risk ?"
From my experience working with Baker and Slb wireline crews.....the risk assessment they go through is pretty much the same.
One thing that has happened over the years is wireline jobs are driven more from townside than from the wireline unit. Improvements in communications and the advent of real time streaming of logging data have been factors here. When you've got someone in town running the show things generally get done by the book....this takes pressure off the field engineer but can be frustrating for the client at times.
- Forums
- ASX - By Stock
- IVZ
- IVZO - Options
IVZO - Options, page-343
-
-
- There are more pages in this discussion • 174 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $107.6M |
Open | High | Low | Value | Volume |
7.1¢ | 7.1¢ | 7.1¢ | $108 | 1.515K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 709800 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.2¢ | 12144 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 709800 | 0.071 |
10 | 580894 | 0.070 |
3 | 150762 | 0.069 |
4 | 520000 | 0.068 |
1 | 133700 | 0.067 |
Price($) | Vol. | No. |
---|---|---|
0.072 | 12144 | 2 |
0.073 | 866000 | 5 |
0.074 | 1022630 | 6 |
0.075 | 992937 | 7 |
0.076 | 1010000 | 5 |
Last trade - 10.04am 06/09/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |