NEMA is secured in 14mths that was delayed 8mths. IWULA is delayed 9mths...
"ResGen will pay for the Marapong wastewater treatment plant upgrade works and expansion works. Further, five large diameter core holes have been drilled on the Kalkpa property, which will be the start of the Boikarabelo opencut mine"
Source: 02/2012 RES Presentaion...
TFR is now developing Waterberg railway upgrade...
TFR's investment: The Coal Line will be increased 60mt(2012) to 81mt in 2014.
TFR's long term plan: 80mt(2014) to 135mt
Source: TFR annual report 2011
TFR contract shouldn't be far away as well....
1.Transnet have detailed plans for Waterberg feeder rail development. 2.Feasibility Study for Waterberg Coal line on the way(upgrade 6mtpa to 24mtpa). 3.Concept Study had been completed on constructing a new haul line from Lephalale to Ermelo.
Once secure IWULA and TFR contract, MC will be +$200m...IMO
DYOR
RES Price at posting:
46.0¢ Sentiment: Hold Disclosure: Held