22 December 2010
J-52 Operations Update
The Board of Jupiter Energy Limited (ASX: JPR) (?JPR? or ?the Company?) is pleased to
provide shareholders with an update regarding progress being made on J-52, the Company's
2010 commitment well.
J-52
The J-52 well has been drilled to a depth of 2992m in the 49 days since spudding and
operational progress has been consistent with the Company drilling plan. While drilling the 8
?? hole section, the geological tops have been very close to prognosis and the prospectivity
of the well can be summarised as follows:
Hydrocarbon shows and corresponding gas peaks (C1-C5) have been encountered in
sandstones below 2849m.
9m of core has been cut and fully recovered from 2855m to 2864m.
Hydrocarbon shows were evident along the core length.
Hydrocarbon shows and corresponding gas peaks have now been encountered in the
interval from 2987m to 2992m.
The rig is now pulling out of hole at 2992m to cut a 9m core. After cutting and recovering
the core, the plan is to drill ahead to total depth of the well at approximately 3100m. The
Company then proposes to fully evaluate, through electric wireline logging, the prospective
reservoirs.
If electric wireline logs indicate that commercial hydrocarbons might be present in one or
more reservoir intervals, the well will be temporarily suspended and the Company will
implement plans for production testing of the well using a smaller, more cost effective,
service rig.
The Company will continue to release further information on the drilling campaign when
matters of material interest occur during the drilling and testing phases.
If shareholders have any questions on this announcement, they should direct them to the
Company on (08) 9322 8222.
ENDS
- Forums
- ASX - By Stock
- JPR
- j-52 operations update
JPR
jupiter energy limited
Add to My Watchlist
0.00%
!
3.0¢

j-52 operations update
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
3.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $38.42M |
Open | High | Low | Value | Volume |
3.0¢ | 3.0¢ | 3.0¢ | $5 | 160 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 300000 | 1.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 50000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 300000 | 0.017 |
2 | 64889 | 0.016 |
1 | 100000 | 0.015 |
1 | 10000 | 0.010 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 50000 | 1 |
0.050 | 170000 | 1 |
0.060 | 7000 | 1 |
0.110 | 12400 | 1 |
0.125 | 523000 | 1 |
Last trade - 10.50am 11/09/2025 (20 minute delay) ? |
Featured News
JPR (ASX) Chart |