Hey @jezyh @baldynumbers@Ashentegra
Sorry for the tardy reply/
I have to give it to Genex on Hustle. They are plugging away at the various ways of getting capital into the project.
Once the plant is operational I think they may be able to start moving to a more sophisticated capital sourcing method or even capital light projects to help manage the long term debt required for such a long time frame payback technology of PH.
I am looking closer now to see whether a long term parcel might be appropriate to place with Genex for the next generation. I see these guys as 10-15 year investment time frame.
- Forums
- ASX - By Stock
- GNX
- J-POWER sign MOU on GNX's K2 150MW Wind Farm for 50% equity
J-POWER sign MOU on GNX's K2 150MW Wind Farm for 50% equity, page-25
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)