thanks J.
from what we've said, the transmission line needs both KW and KH to be feasible?! we can't have one without the other... for powerlink to agree.
by locking in KW first, to me it sounds like we're attempting to provide some significant comfort to whomever is the KH JV will be.
should that not be enough... then expanding the KW to include the extra 100mw may be a fall back plan? just theories...for discussion.
- Forums
- ASX - By Stock
- GNX
- J-POWER sign MOU on GNX's K2 150MW Wind Farm for 50% equity
J-POWER sign MOU on GNX's K2 150MW Wind Farm for 50% equity, page-27
Featured News
Add GNX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online