James Bay
Sustainable hard-rock operation utilizing renewable, clean energy.
– The 2021 Feasibility Study demonstrates lowest quartile development
capital and operating costs
– Hydro-power will predominantly be utilised for the processing plant
– Basic engineering is advancing alongside the procurement process
– Resource and sterilisation drilling commenced in January 2022
– Strong working relations and regular engagement with all stakeholders
– Progression of the ESIA, IBA and regulatory approvals
– Targeting construction to commence in Q3 CY22 and commissioning in
H1 CY24
Reference –
Allkem. (28-02-2022) Half-Year Financial Results p.20
file:///C:/Users/max92/AppData/Local/Temp/2A1359675_AKE.pdf