Drilling programme SNE -5, VR-1, SNE-6, FAN-Sth and SNE North.
SNE -5 spud around 23 rd Jan. SNE -North finished around 7 th August.....approx 182 days.
FAR's 17% paying share at 850k per day =32.9 mill. AU.
End of June FAR had 91.3 mill- 32.9 mill = 58.4 mill left over after paying for drilling 5 wells two of which were drilled to 5000m+ another had a interference test and another had DST.
I think 3 wells next year....WPL only have 1 booked, 3 x 25 days x 850k= ~ $13.5 million to FAR. These wells will most likely be much cheaper than this because of the water depth and rig type required but I have used the higher Stenna number.
58.4 - 13.5= 44.9 million left.
I think its safe to say that we have a fair safety margin for the next 12 months. DB
- Forums
- ASX - By Stock
- FAR
- January 2016 Brent V FAR
January 2016 Brent V FAR, page-8
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
43.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $40.19M |
Open | High | Low | Value | Volume |
44.0¢ | 45.0¢ | 43.5¢ | $173.0K | 394.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 75664 | 43.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
44.5¢ | 15000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 16598 | 0.435 |
2 | 48608 | 0.430 |
1 | 50000 | 0.425 |
2 | 79261 | 0.420 |
2 | 58724 | 0.415 |
Price($) | Vol. | No. |
---|---|---|
0.450 | 98563 | 7 |
0.460 | 1260 | 1 |
0.475 | 15383 | 1 |
0.480 | 3200 | 2 |
0.495 | 26200 | 2 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
44.0¢ |
  |
Change
0.000 ( 1.15 %) |
|||
Open | High | Low | Volume | ||
44.0¢ | 44.5¢ | 43.5¢ | 82596 | ||
Last updated 15.10pm 03/05/2024 ? |
Featured News
FAR (ASX) Chart |