KAR 3.34% $1.74 karoon energy ltd

january drill date? , page-3

  1. 416 Posts.
    Tere was a reference on the tranocean site about the contract beginning Jan 9 (not sure if that is leavign port, on site, or spudding by then).

    Another current thread has someone from COP saying 'mid-Jan'.

    So 6-8 weeks and the mechanical bull that it KAR while drilling should be in motion.

    A couple of months later when Santos starts drilling as well, it wont be for the squeamish.
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.