thursday's start Stuart Petroleum Limited as operator for the Arwon #1 oil and gas exploration well
in PEL 93 advises that the repairs to the drilling rig’s well control system have been
completed. The system has been successfully tested and recertified for service
and remobilised to site this past weekend.
The rig is on location and is undergoing additional maintenance and pre start up
testing. Drilling operations are scheduled to recommence this coming Thursday
morning subject to the completion of this minor additional maintenance work.
The Arwon #1 well has been safely cased with 9-5/8” surface casing to a depth of
735 metres. When drilling operations resume the well will be re-entered and drilled
to plan to evaluate the primary targets in the McKinlay, Birkhead, Hutton and the
Patchawarra formations.
Yes tomorrow is the day, and for my surprise I've even got some more at 1.25, thought the stock would keep climbing on the news of a possible good recovery.
Oh well, last chance take your positions and good luck all.
- Forums
- ASX - By Stock
- STU
- jittery b2 to tastarga
jittery b2 to tastarga, page-3
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)