Sorry missed your last line there Grangeh.
It would be nice to build our own line but how much would a 400km oil pipeline from Johnstone to Alice Springs cost? I shudder to think. I might ring the company to see if I can milk some information out of them:)
I found this on existing Mereenie and Palm Valley pipelines from...http://www.nt.gov.au/d/Minerals_Energy/index.cfm?Header=Pipelines#2
"Licence 1 - Palm Valley Pipeline
Completed in 1983. Supplies natural gas to Alice Springs area. Length -140km long; Internal diameter - 8 inch; Maximum operating pressure - 7000kPa. [top]
Licence 2 - Mereenie Oil Pipeline
Completed in 1985. Carries crude oil from the Mereenie oil and gas field to Brewer Estate south of Alice Springs for transhipment to South Australia. Length - 269km; Internal diameter - 8 inch; Maximum operating pressure - 9000 kPa.
Licence 4 - Amadeus Basin to Darwin Pipeline
Completed in 1986. Supplies natural gas to Darwin, Katherine, Tennant Creek and other centers either directly or through connecting pipelines. Length - 1660km; Internal diameter - mainly 12 and 14 inch; Maximum operating pressure - 9,650kPa (with the exception of the 116km Mereenie lateral which is designed for 10,150kPa)."
- Forums
- ASX - By Stock
- CTP
- johnstone misinformation
johnstone misinformation, page-6
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $37.74M |
Open | High | Low | Value | Volume |
5.1¢ | 5.1¢ | 5.1¢ | $2.94K | 57.64K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 740000 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.2¢ | 34474 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 740000 | 0.050 |
2 | 220428 | 0.049 |
2 | 1180647 | 0.048 |
1 | 200000 | 0.047 |
1 | 100000 | 0.046 |
Price($) | Vol. | No. |
---|---|---|
0.052 | 34474 | 1 |
0.054 | 52587 | 1 |
0.055 | 450000 | 1 |
0.058 | 172431 | 1 |
0.059 | 25000 | 1 |
Last trade - 13.38pm 30/07/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online