Hi, Sav..Agree totally with you on the GSG and HeN possible scenarios...It will most certainly have to be a multi rig programme if all of the forecast program is to even stand a chance of being met...
If the programme gets underway, say beginning of March and runs thru to the end of October, then that will afford some 8 months,or approx. 245 days of possible in-the-field working days....
8 conventional wells at,say, 40 days per well,(includes Mob. and Demob)=320 days..For all sorts of reasons, I would suspect that programme would not total 8 wells, but realistically, something like 6 wells, absolute maximum.(6x40=240),utilizing one Rig..No break-downs!! No downhole problems!! No time for contingencies...
Now the intriguing part...Some 40 CBM wells are proposed at say,30 days each,(includes Mob.& Demob.),
= some 1200 drilling days, divide by 245 available field days,= a minimum of 5 CBM rigs...
That would be a most intensive program in any company's workbook.. The logistics, alone, are mind-boggling...6 Rigs to "baby-sit'and crews to keep happy..Randy will be a busy boy!! Challenging, but possible...
- Forums
- ASX - By Stock
- joint ventures
Hi, Sav..Agree totally with you on the GSG and HeN possible...
-
- There are more pages in this discussion • 74 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTP (ASX) to my watchlist
|
|||||
Last
5.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $39.96M |
Open | High | Low | Value | Volume |
5.4¢ | 5.4¢ | 5.4¢ | $238 | 4.412K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 560000 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 15588 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 560000 | 0.050 |
1 | 280000 | 0.049 |
1 | 1000000 | 0.048 |
2 | 99092 | 0.045 |
3 | 128222 | 0.041 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 15588 | 1 |
0.055 | 18545 | 1 |
0.060 | 210909 | 3 |
0.063 | 32737 | 1 |
0.067 | 10000 | 1 |
Last trade - 16.10pm 03/07/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO & MD
Anthony Noble
CEO & MD
Previous Video
Next Video
SPONSORED BY The Market Online