RNE 11.1% 0.5¢ renu energy limited

jolokia 1 spudded

  1. 184 Posts.
    GEODYNAMICS
    L I M I T E D ABN 55 095 006 090
    SUITE 6 LEVEL 1 19 LANG PARADE PO BOX 2046 MILTON QUEENSLAND 4064 AUSTRALIA
    TEL +61 7 3721 7500 FAX +61 7 3721 7599 EMAIL [email protected]
    ASX ANNOUNCEMENT 18 MARCH 2008
    Jolokia 1 spudded
    Geodynamics is pleased to announce that Jolokia 1 was spudded early this morning
    and had drilled 45 metres at 6 am with an initial rate of penetration of 10-20 metres
    per hour. The well is being drilled 610 mm diameter to 580 metres for this section
    being the first casing point.
    Rig 100 rigged up at Jolokia 1 with five inch drill pipe in the foreground
    Rig 100 with “turkey’s nest” pond holding rig site water supply
    Jolokia 1 is located approximately 9 km from Habanero and is targeting fractured
    granites at a similar depth known to be 10°C hotter than the Habanero wells. Its
    target well depth is 4,250 metres.
    As for Habanero 3, Geodynamics intends to provide the market an update on drilling
    progress at Jolokia 1 approximately every two weeks. For further information please
    check our website (www.geodynamics.com.au) or contact Mr Gerry Grove-White or
    Paul Frederiks on + 61 7 3721 7500.
    Gerry Grove-White
    Managing Director
    Participants in Jolokia 1 and the Innamincka Joint Venture are:
    Geodynamics (Operator) – 70%
    Origin Energy Geothermal Pty Ltd* – 30%
    *A wholly owned subsidiary of Origin Energy Limited (ASX:ORG)
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.001(11.1%)
Mkt cap ! $3.630M
Open High Low Value Volume
0.4¢ 0.5¢ 0.4¢ $3.405K 764.3K

Buyers (Bids)

No. Vol. Price($)
25 8469440 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 4218211 9
View Market Depth
Last trade - 15.57pm 30/07/2024 (20 minute delay) ?
RNE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.