With SMR and COK so close the drilling program should be relativley easy to make it a JORC.
Not to sure about the infrastruture? Any thoughts
From the prospectus
The Back Creek project is in the Surat Basin. The Back Creek project area has an exploration target of 60 to 80 million
tonnes of export quality thermal coal capable of being mined by open cut.3 Drilling to date by the Company, in conjunction
with exploration in adjacent areas down dip and along strike, have demonstrated the potential of the area.
With SMR and COK so close the drilling program should be...
Add to My Watchlist
What is My Watchlist?