JORC RESOURCE FOR OLDKONONGO TAILINGS DAMThe Company is very...

  1. 163 Posts.
    JORC RESOURCE FOR OLD
    KONONGO TAILINGS DAM
    The Company is very pleased to announce the JORC resource for the
    Old Konongo Tailings Dam, contained within the Konongo Gold
    Project in the world class Ashanti Gold Belt of Ghana. The resource
    is 1.75 million tonnes at a grade of 1.09g/t gold for approximately
    61,150 ounces of contained gold classified as follows:
    Class Tonnes Grade (g/t) Ounces Au
    Indicated 1,177,000 1.19 45,050
    Inferred 575,000 0.87 16,100
    Total 1,752,000 1.09 61,150
    Significantly this resource includes a high grade area of
    448,500 tonnes at 1.66g/t
    for almost 24,000 ounces of contained gold.
    The Old Konongo Tailings Dam contains residual material from
    processing at the historic Konongo Mine, which was operational
    between 1918 and 1986. Records show that approximately 2.8 million
    tonnes of ore was processed at a head grade of 15.7g/t recovering
    approximately 1.4 million ounces.
    The JORC resource for the Old Konongo Tailings Dam is based on
    aircore drilling carried out in late 2009. 131 aircore holes were drilled
    across the dam at spacings of 50 metres by 25 metres and 25 metres
    by 25 metres for a total of 2,376 metres. Drilling identified high grade
    areas within the dam where intersections were consistently greater
    than 1.5g/t gold (Figure 1).
    The Old Konongo Tailings Dam is one of a number of surface
    stockpiles/dumps which the company is evaluating to determine if
    they can provide feed for the existing 350ktpa CIL plant. The cost of
    reclaiming these stockpiles will be less than that of mining new ore
    making them potentially viable sources of millfeed. The option of
    blending tailings material with oxide ore is also being assessed as part
    of the optimisation of the mining schedule. Note that the high grade
    portion of the Old Konongo Tailings Dam resource could provide
    sufficient material to run the CIL plant for the first year of operation.
    Preliminary metallurgical testwork indicates that recoveries of over
    60% are achievable from this material, with recoveries as high as 80%
    being achieved. Further work is underway to confirm these results.
    The total resource for the project is now 19.6 million tonnes at a
    grade of 2.02g/t gold for 1.27 million ounces of contained gold and
    is classified as follows:
    Class Tonnes Grade (g/t) Ounces Au
    Indicated 8,804,500 2.01 568,235
    Inferred 10,814,000 2.03 704,395
    Total 19,618,500 2.02 1,272,630
    Details of the resource contained in individual deposits are given in
    Table 1. The Company reminds investors that the second tranche of
    shares to Mwana Africa PLC is only required after delineation of 1
    million ounces in the Measured and Indicated categories.
    The Company is entering an important phase in the development of
    the Konongo Gold Project with the mining study and plant assessment
    nearing completion.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.