JORC Code compliant inferred resources for the Taylor Ranch Uranium Project are:
132.8Mt at 0.027% U3O8 for 79.6 million pounds of U3O8
(applying a cut-off grade of 0.01% U3O8)
Or
36.9Mt at 0.059% U3O8 for 48.1 million pounds of U3O8
(applying a cut-off grade of 0.025% U3O8)
Or
8.4Mt at 0.12% U3O8 for 22.2 million pounds of U3O8
(applying a cut-off grade of 0.075% U3O8)
Paladin Energy – Market capitalisation of $4.1 billion
Langer Heinrich Uranium Deposit in Namibia measured, indicated and inferred resources are:
80.1Mt at 0.06% U3O8 for 105.6 million pounds of U3O8
Applying a cut-off grade of 0.025% U3O8
Applying the same cut-off grade the resource at the Taylor Ranch Uranium Project is approximately half the size and is of the same grade!
{taken from Dec BLR Corporate Presentation)
Nothing wrong with inferred resources. Only more drilling can convert them to indicated or measured resources - that is the nature of the beast.
It is all about stats.
- Forums
- ASX - By Stock
- BLR
- jorc resources for jagmans
jorc resources for jagmans
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)