March 2012 is target for the maiden JORC. Looking for possible 3b t from just 1 of these 24 leases. The first ore body (Agbaja) is around 15 km by up to 7 km wide and up to 30 metres thick at very shallow depth. It's quite possible that there could be more ore bodies deeper you'd expect they will drill to around 200 m.
Add to My Watchlist
What is My Watchlist?