29101971
It is not hard to see where 3 billion tonne will come from when you look at the size of the lease .
Say 14k x 6 k x 30 =2.5b and they say the ore bodies lay on top of each other .
If there are two of them then this is looking very interesting .With the other leases and the Hematite over the river we could be looking at way more than 3 billion tonnes .There is no reason this could not be 6billion when you take in all the leases.
Those are the sort of figures that will help with the share price thank you 29101971
Add to My Watchlist
What is My Watchlist?